San Julián

San Julian silver-gold mine contributed 21.0% to total silver production and generated 12.9% of total adjusted revenue (2024).

The San Julián silver-gold project is a cornerstone of our current and future production goals. The geological potential identified in the region thus far may be sufficient to establish a new mining district in the future. The San Julián project includes construction of two plants: i) a dynamic leaching plant to treat ore from the veins and ii) a flotation plant with 6,000 tpd capacity to process ore from the disseminated body.

Overview

Asset:

San Julián

Ownership:

100% Fresnillo plc

Location:

Chihuahua/Durango border 

Commodity:

Silver/Gold

Operational since:

2H16 (Vein System) / 2Q17 (Disseminated Ore Body)

Facilities:

Underground mine, flotation plant and a dynamic leaching plant

Workforce:

792 employees, 1,256 contractors

Life of Mine:

3.8 Veins (2022: 4.8), 1.1 Disseminated Ore Body (2022: 2.8)

Mine Production

1Q25

4Q24

% change

1Q24

% change

FY24

FY23

% change

Ore processed: - Veins (t)

292,574

329,250

(11.1)

291,003

0.5

1,236,682

1,142,309

8.3

Production: Veins

Gold (oz)

12,088

13,394

(9.7)

11,973

1.0

49,633

41,009

21.0

Silver (koz)

 1,979

2,287

(13.5)

2,039

(2.9)

8,443

5,559

51.9

Ore grades: Veins

Gold (g/t)

 1.36

1.31

3.3

 1.35

0.1

1.31

1.17

12.0

Silver (g/t)

231

234

(0.9)

 239

3.2

232

166

39.8

Production Highlights

51,413

Gold (oz)

(FY24)

% 15.6 Change

11,836

Silver (koz)

(FY24)

% (11.3) Change


Financial Highlights

469.6

Adjusted Revenue

(US$m, FY24)

% 21.8 Change

253.8

Segment Profit

(US$m, FY24)

% 59.9 Change

49.4

Capital Expenditure

(US$m, FY24)

% -34.0 Change

16.5

Exploration

(US$m, FY24)

% -45.0 Change

Production Report

1Q25 Production Report

San Julián Veins

  • Quarterly silver production decreased 13.5% vs. 4Q24 mainly due to the lower volume of ore processed driven by an electrical fault that affected the ball mill and required an unplanned maintenance stoppage in February.

  • Quarterly gold production decreased 9.7% vs. 4Q24 due to lower volume of ore processed partially mitigated by the higher ore grade. Quarterly gold production was in line with 1Q24.

  • Silver and gold ore grades in 2025 are expected to be in the ranges of 210-230 g/t and 1.10-1.30 g/t respectively.

San Julián Disseminated Ore Body (DOB)

  • Mining activities concluded in November 2024 as per previous guidance.

SJ